Monday, 4 November 2013
Tiling works have started on the top floor flats inside Sandy Mount. Once the flats have been tiled in both the kitchens and the bathrooms the 2nd fix mechanical and electrical works can take place.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)